LATEST NEWS
September 2020
10 Years JIG Member
It is with great pride and honour that hansaconsult Ingenieurgesellschaft mbH team enters the JIG (Joint Inspection Group) Member 10-years
March 2020
Unleash the power of your team
We encourage our clients worldwide to utilize the available tools to stay connected and productive while working remotely with
hansaconsult Ingenieurgesellschaft mbH Statement on COVID-19
"We hope, first of all, that you and your teams, colleagues, and relatives are currently not directly affected and
DANKE FÜR EUREN EINSATZ!
We wish to give our deepest gratitude for the hard work everyone of you has displayed in safeguarding us.
October 2019
OFC Visit to hansaconsult
Mr. Nikolaos Kontaxis & Mr. Kyriakos Gennadis visit to hansaconsult headquarter to discuss possible future cooperation, and extend our
September 2019
Design Review and Construction Supervision for Aviation Fuel Farm
Supervision is currently ongoing for the construction of the fuel farm at Gibraltar International Airport, we are fully committed towards
Extended Cooperation at Terminal Sheremetyevo Alexander S. Pushkin International Airport
Hydraulic Simulation for the hydrant system to ensure safe operation and optimum system sizing, our cooperation in Russia has been
August 2019
Automation, Control & TCS Startup at Algiers International Airport
Currently Ongoing...Supervision & Startup... in cooperation with: China State Construction Algeria Co.Ltd. Our cooperation with China State Construction Algeria Co.Ltd.
TCS® at Guangzhou Baiyun International Airport Co., Ltd
Our cooperation with Guangzhou Baiyun International Airport Co., Ltd. 🇨🇳 has been extended in the Tightness Control System (#TCS) for
June 2019
TCS® Extension at Manchester International Airport
TCS® (Tightness Control System) Extension and re-calibration successfully finalized Manchester Airport. Thanks to Dr. Klaus peters from hansaconsult Ingenieurgesellschaft mbH