Airport Nuremberg
conceptual study for new tank farm detail planning for extension of tank farm with loading-/ unloading-facilities programming and supply of
conceptual study for new tank farm detail planning for extension of tank farm with loading-/ unloading-facilities programming and supply of
Rescheduling/Extension of tank farm Landshut with regad to MOGAS facility, 2006/2007
Detail planning and tender planning for tank farm incl. storage and output facilities
Standard planning on-base BMVg Hydraulic Study/Execution of a measurement, Analyse of measurement, preparation of result report, 2008
Adjustment of TCS pump control system, 2002 Analogue alarms, systems control JET A1, 2003
reconstruction of tank fields (approx. 50,000 m²) and tanks authority applications fuelling assembly installation of double bottoms with vacuum monitoring
feasibility study for modernization of rail wagon- loading-/ unloading-stations
revision and update of defined drawings, 2007 detail planning of new tank farm supervision programming and supply of PLC and
reconstruction of unloading area acc. to VAwS
authority application application for underground tank facility, 2008 Detail Engineering, 2008 Site management, 2008