Airport Nuremberg
conceptual study for new tank farm detail planning for extension of tank farm with loading-/ unloading-facilities programming and supply of
conceptual study for new tank farm detail planning for extension of tank farm with loading-/ unloading-facilities programming and supply of
Leakage Detection System TCS 1994
Design and Engineering, 2013 TSC Tighness Control System, 2013 Construction managment, 2013
Engineering for new Tank Farm, work phases 01-05, 2007/20083 Clients: OFC Aviation Fuel Services S.A., Athens, Greece
feasibility study for a hydrant system and a new tank farm
planning of implementation of TCS Phase I, 2004 Leakage Detection System TCS, 2005
reconstruction of tank fields (approx. 50,000 m²) and tanks authority applications fuelling assembly installation of double bottoms with vacuum monitoring
Procurement of hardware for TCS Upgrade, 2008 Procurement of EFSO-Hardware, 2008 Leakage Detection System TCS, 1999/2004 Clients: Preussag
revision and update of defined drawings, 2007 detail planning of new tank farm supervision programming and supply of PLC and
authority application application for underground tank facility, 2008 Detail Engineering, 2008 Site management, 2008